During the meeting participant agree that beneficiary (Penerima Manfaat) of WASPOLA Facility is from national level (WSS-related ministries), provincial government (through WSS provincial WSS working group), local government (through WS Districts-WG), university(s), NGO(s) and secretariat of WSS national WG. Also discussed critically how to encourage Penerima Manfaat to send their proposal as soon as possible and how the central level (Steering Committee/SC and/or Technical Team/TT) reviews the proposal fairly. Clear manual for proposal format and review is needed to avoid vested of interest. As known, flow of proposal approval is through 2 mechanisms, where if (1) proposal’s budget is more than USD 100.000 approval will be by SC, and (2) if below USD 100.000 will be by TT. SC is represent of Bappenas, WSP and AusAID, meanwhile the TT is represent of echelon 2 (director level) from the national WSS WG members. Flow of proposal submission and approval is as shown in the flowchart.
Procurement issue is also become a critical aspect discussed during the meeting. Mrs. Maraita Listyasari, Bappenas, presented the fund channeling used in the WASPOLA Facility, particularly the government received budget, namely as Recipient Executed (RE). Maraita said that for RE, the procurement system is refer to the Keputusan President (President Decree) No. 80/2003 (Kepres 80/2003).
After meeting closing, the WASPOLA Facility held an internal meeting, chaired by Mr. Gary Swisher, to follow up and assess the appropriate scenario to accelerate WASPOLA Facility activity.
|
without water we could only live for a few days ? |